In the News

In the News

A first look inside the Smithsonian’s African American museum: Stunning views, grand scale

SmithGroupJJR/Freelon Adjaye Bond and lead designer David Adjaye were selected in 2009. With construction beginning in 2012, the museum is set to open on September 24, 2016. 

Learn More

In the News

SmithGroupJJR’s Electrical and Computer Engineering Building named 2016 Lab of the Year

Sustainable features like chilled beams and solar screens help the University of Illinois research facility use 50% less energy than minimum building energy efficiency standards.

Learn More

In the News

Ford sets its sights on a radical new high-tech Headquarters

New buildings, located in two campus’ designed by Michigan-based architecture firm SmithGroupJJR, will see a fifty-percent reduction in energy consumption, save water, and include a new zero-waste, zero-energy, zero-water Sustainability Showcase building.

Learn More

In the News

Ford Unveils Dramatic 10-Year Campus Revitalization Designed by SmithGroupJJR

Ford's Dearborn, Michigan campus will be reimagined to include two primary facilities across 7.5 million sqaure feet of workspace.

Learn More

In the News

Ford looks to Silicon Valley in corporate campus redesign

Transforming Dearborn Campus to Further Drive Innovation, Collaboration and Invest in Employees

Learn More